With 3 weeks to go, you should already have a builder. If not, brief several builders this week and ask for a modular or semi-custom stand, which can be produced faster.
- Dates
- 11–12 November 2026
- Venue
- IFEMA Madrid, Halls 2 and 4
- City
- Madrid, Spain
- Sector
- Logistics
- Organiser
- logisticsautomationmadrid.com
- Show page
- Logistics Distribution builders & dates
About Logistics Distribution
Logistics Distribution is a trade show for logistics, intralogistics and automation (Logistics & Automation Madrid), held in Madrid, Spain at IFEMA Madrid, Halls 2 and 4. It takes place every year. Exhibitors can compare exhibition stand builders who work at the show and request stand proposals with one brief on StandsZone Global.
The 2026 edition runs 11–12 November 2026. Exhibitors who want a stand that stands out in the hall need a builder who knows IFEMA Madrid, Halls 2 and 4, its build-up rules and its delivery schedule. Dates on this page are checked against the organiser’s announcement.
Your stand timeline for Logistics Distribution 2026
These dates are counted back from the opening day, 11 November 2026. Your exhibitor manual has the binding deadlines; use this as your working plan.
- 16 weeks before22 July 2026 · passed
Shortlist builders and send one brief
Share stand size, hall and stand number (if allocated), budget range and what the stand must achieve at Logistics Distribution. Ask three to five builders who work in Madrid to quote on the same brief so the offers are comparable.
- 12 weeks before19 August 2026 · passed
Choose the builder and approve the concept
Compare quotes line by line (see the checklist below), check recent stands the builder has delivered, then sign off the 3D concept, budget and payment schedule.
- 10 weeks before2 September 2026 · passed
Read the exhibitor manual
The organiser’s manual sets the real deadlines for stand plans, rigging, electrics, water and flooring orders, and lists any approved-contractor rules. Send it to your builder as soon as you receive it.
- 8 weeks before16 September 2026 · passed
Submit final drawings for approval
Custom and double-deck stands usually need technical drawings and structural calculations approved by the organiser before build-up. Your builder normally prepares and submits them.
- 6 weeks before30 September 2026 · passed
Send final graphics
Artwork for walls, counters and screens should be final and print-ready, in the sizes your builder specifies. Late changes are the most common cause of extra cost.
- 3 weeks before21 October 2026
Confirm logistics and staff
Book exhibitor badges, furniture, AV and lead-capture devices, and agree delivery and storage of your products with the builder.
- Before openingBuild-up ends 10 November 2026
Build-up on site
Build-up typically runs one to four days before opening, depending on stand size and the hall schedule in the manual. Plan a final walk-through with the builder the evening before.
- Show days11–12 November 2026
Logistics Distribution is open
Keep the builder’s on-site contact number handy for small repairs during the show.
What works for vehicle and transport stands
Vehicles and machines set the layout: plan access doors, turning space, floor protection and lighting that shows the product well. Builders need the exhibit dimensions and weights early.
Choosing a stand type
Shell scheme
The organiser’s basic package of walls, fascia and lighting. The lowest cost and effort; a builder can still add graphics and furniture.
Modular system
Reusable aluminium frames with fabric graphics. Quick to install and good value if you exhibit at several shows a year.
Custom built
Designed and built for your brand and space, usually from timber and mixed materials. The most impact and the most planning time.
Double-deck
A second level for meetings on large island spaces. Needs structural approval and the longest lead time.
What every quote should include
Quotes for the same stand can differ a lot because builders include different things. Ask each builder to price these items separately:
- Design, project management and drawings for organiser approval
- Construction materials and finishes (walls, flooring, counters, storage)
- Graphics production and installation
- Electrics and lighting, and who orders the venue connection
- Furniture, AV and screens (bought or rented)
- Transport, build-up, dismantling and waste removal
- Storage of reusable parts after the show
- Insurance, payment terms and what happens if the design changes
Planning resources
- How to write a stand brief
A copy-and-paste template for your builders.
- Exhibition stand costs
What you pay for and how to compare quotes.
- Choosing a stand builder
Questions to ask and warning signs.
- Stand types compared
Shell scheme, modular, custom or double-deck.
Stand builders in Madrid
All 13 builders in Madrid →
DysenyoStands. Diseño de stands, fabricación y montaje de stands de feria cuando y donde lo necesites. Proyectos integrales de fabricación y montaje de stands. España y Europa.

Custom and modular exhibition stands for Spain and European events. Explore completed projects and discuss design, build and installation for your event.
5.0 Google rating (28 reviews)

Empresa de Diseño de stands para centros comerciales en Madrid. Diseño de stands en ferias - eventos - galerias.
5.0 Google rating (9 reviews)

Diseño y fabricación de stands en Madrid; Más de 2 décadas de experiencia acumuladas en el sector de ferias y congresos..
5.0 Google rating (1 review)

En Exhibita diseñamos y construimos stands de alto impacto para ferias, congresos y eventos en España y Europa. Nos ocupamos de todo: creatividad, fabricación, montaje y sostenibilidad con huella de carbono calculada (RD 214/2025).
4.9 Google rating (19 reviews)
Eventos únicos que brindan oportunidades de negocio, conocimiento y contactos Próximos eventos Eventos únicos Creamos eventos únicos que brindan oportunidades de negocio, conocimiento y contactos Tenemos más de 30 años de experiencia en la industria de salones y congresos Confiamos en nuestros eventos como herramientas de negocio eficaces, rentables y que crean valor Diseñamos nuestros […]
Frequently asked questions
When is Logistics Distribution 2026?
Logistics Distribution 2026 runs 11–12 November 2026 at IFEMA Madrid, Halls 2 and 4, Madrid, Spain. Dates are checked against the organiser’s website.
When should I book a stand builder for Logistics Distribution?
About 12–16 weeks before the show, which means by 19 August 2026 at the latest for a custom stand. Modular and shell-scheme stands can be arranged later, but the best builders in Madrid fill up early for major shows.
How many quotes should I get?
Three to five, all based on the same brief, so you can compare like for like. The checklist in this guide lists what each quote should cover.
Do I need a builder based in Madrid?
Not necessarily, but a builder who regularly works at IFEMA Madrid, Halls 2 and 4 knows the hall rules, delivery slots and local suppliers, which reduces risk and transport cost.
How do I get quotes through StandsZone Global?
Send one brief for Logistics Distribution with your stand size, budget and dates. It is shared with exhibition stand builders listed on StandsZone Global, and interested builders contact you with questions and proposals. It’s free for exhibitors.
Get stand quotes for Logistics Distribution 2026
Send one brief with your stand size and budget. Builders listed on StandsZone Global contact you with questions and proposals. Free for exhibitors.