Exhibition stand builders for Satis 2026

4–5 November 2026 · Les Docks de Paris, Aubervilliers, Paris, France

By StandsZone Global editorial teamPublished 6 August 20262 weeks to opening
In short

With 2 weeks to go, you should already have a builder. If not, brief several builders this week and ask for a modular or semi-custom stand, which can be produced faster.

Dates
4–5 November 2026
Venue
Les Docks de Paris, Aubervilliers
City
Paris, France
Sector
Audiovisual
Organiser
satis-expo.com
Show page
Satis builders & dates

About Satis

Satis is a trade show for audiovisual production, broadcast and immersive technology, held in Paris, France at Les Docks de Paris, Aubervilliers. It takes place every year. Exhibitors can compare exhibition stand builders who work at the show and request stand proposals with one brief on StandsZone Global.

The 2026 edition runs 4–5 November 2026. Exhibitors who want a stand that stands out in the hall need a builder who knows Les Docks de Paris, Aubervilliers, its build-up rules and its delivery schedule. Dates on this page are checked against the organiser’s announcement.

Your stand timeline for Satis 2026

These dates are counted back from the opening day, 4 November 2026. Your exhibitor manual has the binding deadlines; use this as your working plan.

  1. 16 weeks before
    15 July 2026 · passed

    Shortlist builders and send one brief

    Share stand size, hall and stand number (if allocated), budget range and what the stand must achieve at Satis. Ask three to five builders who work in Paris to quote on the same brief so the offers are comparable.

  2. 12 weeks before
    12 August 2026 · passed

    Choose the builder and approve the concept

    Compare quotes line by line (see the checklist below), check recent stands the builder has delivered, then sign off the 3D concept, budget and payment schedule.

  3. 10 weeks before
    26 August 2026 · passed

    Read the exhibitor manual

    The organiser’s manual sets the real deadlines for stand plans, rigging, electrics, water and flooring orders, and lists any approved-contractor rules. Send it to your builder as soon as you receive it.

  4. 8 weeks before
    9 September 2026 · passed

    Submit final drawings for approval

    Custom and double-deck stands usually need technical drawings and structural calculations approved by the organiser before build-up. Your builder normally prepares and submits them.

  5. 6 weeks before
    23 September 2026 · passed

    Send final graphics

    Artwork for walls, counters and screens should be final and print-ready, in the sizes your builder specifies. Late changes are the most common cause of extra cost.

  6. 3 weeks before
    14 October 2026 · passed

    Confirm logistics and staff

    Book exhibitor badges, furniture, AV and lead-capture devices, and agree delivery and storage of your products with the builder.

  7. Before opening
    Build-up ends 3 November 2026

    Build-up on site

    Build-up typically runs one to four days before opening, depending on stand size and the hall schedule in the manual. Plan a final walk-through with the builder the evening before.

  8. Show days
    4–5 November 2026

    Satis is open

    Keep the builder’s on-site contact number handy for small repairs during the show.

What makes a stand work at this show

Decide what visitors should do on the stand (see a demo, book a meeting, take a sample) and design around it. A clear message readable from the aisle, good lighting and an uncluttered layout matter more than size.

Choosing a stand type

Shell scheme

The organiser’s basic package of walls, fascia and lighting. The lowest cost and effort; a builder can still add graphics and furniture.

Modular system

Reusable aluminium frames with fabric graphics. Quick to install and good value if you exhibit at several shows a year.

Custom built

Designed and built for your brand and space, usually from timber and mixed materials. The most impact and the most planning time.

Double-deck

A second level for meetings on large island spaces. Needs structural approval and the longest lead time.

What every quote should include

Quotes for the same stand can differ a lot because builders include different things. Ask each builder to price these items separately:

  • Design, project management and drawings for organiser approval
  • Construction materials and finishes (walls, flooring, counters, storage)
  • Graphics production and installation
  • Electrics and lighting, and who orders the venue connection
  • Furniture, AV and screens (bought or rented)
  • Transport, build-up, dismantling and waste removal
  • Storage of reusable parts after the show
  • Insurance, payment terms and what happens if the design changes

Planning resources

Stand builders in Paris

All 11 builders in Paris →
  • Making Brands tangible ✔ Exhibitions, event construction & brand spaces ✔ Delivered in partnership, creatively & internationally → Discover ET GLOBAL now!

  • Meilleurstand logo
    Unclaimed profile

    Meilleurstand

    Based in Paris, France

    Display stand manufacturer based in Paris, France.

    4.9 Google rating (19 reviews)

  • Standelite logo
    Unclaimed profile

    Standelite

    Based in Paris, France

    Boost your corporate events with Standelite. Premium custom tension fabric displays and airtight inflatable tents. 48h express delivery available.

  • adEXPO logo
    Unclaimed profile

    adEXPO

    Based in Paris, France

    Custom design stands by adEXPO. As your partner and stand designer from A to Z, we've been putting our expertise to trade shows since 1989.

    5.0 Google rating (3 reviews)

  • R2 Stand & Event logo
    Unclaimed profile

    R2 Stand & Event

    Based in Paris, France

    Découvrez le standiste expert en conception de stands pour salons professionnels : des stands qui marquent les esprits et atteignent vos objectifs

    4.1 Google rating (9 reviews)

  • Unclaimed profile

    Evolu Stand

    Based in Paris, France

    Stall installation service based in Paris, France.

    4.9 Google rating (12 reviews)

  • Frequently asked questions

    When is Satis 2026?

    Satis 2026 runs 4–5 November 2026 at Les Docks de Paris, Aubervilliers, Paris, France. Dates are checked against the organiser’s website.

    When should I book a stand builder for Satis?

    About 12–16 weeks before the show, which means by 12 August 2026 at the latest for a custom stand. Modular and shell-scheme stands can be arranged later, but the best builders in Paris fill up early for major shows.

    How many quotes should I get?

    Three to five, all based on the same brief, so you can compare like for like. The checklist in this guide lists what each quote should cover.

    Do I need a builder based in Paris?

    Not necessarily, but a builder who regularly works at Les Docks de Paris, Aubervilliers knows the hall rules, delivery slots and local suppliers, which reduces risk and transport cost.

    How do I get quotes through StandsZone Global?

    Send one brief for Satis with your stand size, budget and dates. It is shared with exhibition stand builders listed on StandsZone Global, and interested builders contact you with questions and proposals. It’s free for exhibitors.